Proposed Resource Consent Conditions

125 CONSENT TYPE AND ACTIVITIES AUTHORISED S13 To place a structure in the bed of an undefined waterbody. S14 To dam water within the Water Treatment Plant Collection Pond. S15 To discharge water from the Water Treatment Plant collection pond to the Ohinemuri River. LOCATION Area 5 TERM 35 years LAPSE PERIOD 10 years Schedule One – Common Conditions Which Apply to All Waikato Regional Council and Hauraki District Council Consents 1 The Consent Holder shall comply with the common conditions between the Hauraki District Council and the Waikato Regional Council in Schedule One as relevant to the management of activities authorised by this consent. Schedule Two – General Conditions Which Apply to All Waikato Regional Council Consents 2 The Consent Holder shall comply with the general conditions in Schedule Two which apply to all Waikato Regional Council consents as relevant to the activities authorised by this consent. General Requirements 3 At least 20 working days prior to the first exercise of this consent, the Consent Holder shall advise the Waikato Regional Council in writing of the date upon which the exercise of this consent is to be physically commenced. Maintenance Requirements 4 The Consent Holder shall be responsible for the structural integrity and maintenance of the works associated with the exercise of these consents and for any erosion control and energy dissipation works which become necessary as a consequence of the exercise of this consent. Design Requirements 5 The Water Treatment Plant collection pond shall be designed, constructed and operated to have a minimum water storage capacity equivalent to the volume of run-off generated from within its catchment during a 10-year return period, 72-hour duration, design storm taking into account a combination of both storage volume and pumping rate. Operational Requirements

RkJQdWJsaXNoZXIy MjE2NDg3