Supporting Technical Assessments

10 Broken foundations due to site modifying. Recommendations. 1. Water. Suitable drainage installed to drain water away from the track. 2. Falling pipe(s). Keep the public back from the potentially danger area by placing signage and fencing if necessary. 3. Trip hazards. Where possible remove or re route track. In the case of rocks they could be dug out. Some will be covered by gravel from forming the track. Stumps can be dug out. Tree roots provided they are not large can be covered thus preventing die back of the tree. 4. Drops around banks/foundations. Fencing to prevent close access to the drop off. Fence Battery site due to heaps of broken rock/concrete. 5. Long grass. Fire hazard especially during the summer months. Cut and keep short. 6. Old Trees. Cut back. 7. Short steep section of track. Either re route track or build steps with a hand rail. 8. Mining. At present all mining is confined to deep underground activity and presents very little problems. One exception is that of the conveyer belt which can start at any time. Warning signs should be placed along where the

RkJQdWJsaXNoZXIy MjE2NDg3