Supporting Technical Assessments

OH OH OH E E OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH E E E E E E www.beca.com www.beca.com © Beca 2022 RESOURCE CONSENT NOT FOR CONSTRUCTION 2210983-203-SK1 0 CIVIL WAIHI NORTH WATER TREATMENT PLANT OUTFALL DISCHARGE UPGRADE 1:1500 1:3000 P.JOHNSON 15.03.22 J.SPEEDY 15.03.22 L.SUE 25.03.22 H.KERR 25.03.22 No. Appd Revision Date * Refer to Revision 1 for Original Signature Scale (A1) Scale (A3) Reduced Drg Check Dsg Verifier Drawn Original Design Construction* Date Approved For Client: Project: Title: Drawing No. Discipline Document No. Rev. Drawing Plotted: 25 Mar 2022 4:28 pm 2210983-203-SK1 TO SK4.DWG DO NOT SCALE FOR SET OUT DIMENSIONS By Chk N NOTES 1. PROPOSED PIPELINE ALIGNMENT IS DUPLICATIVE OF THE EXISTING ALIGNMENT AND MAY VARY SUBJECT TO EXISTING SITE FEATURES OR SENSITIVE AREAS. 2. AIR VALVES TO BE PROVIDED AT HIGH POINTS ALONG PROPOSED PIPELINE (LOCATIONS TBC). 3. SCOUR VALVES TO BE PROVIDED AT LOW POINTS ALONG PROPOSED PIPELINE (LOCATIONS TBC). LEGEND PROPOSED DISCHARGE PIPE PROPOSED RELOCATION OF EXISTING DISCHARGE PIPE EXISTING DISCHARGE PIPE HIGH VOLTAGE OVERHEAD HIGH VOLTAGE UNDERGROUND PARCEL BOUNDARIES FUTURE GLADSTONE PIT STOCKPILE GLADSTONE WETLAND WETLAND 10m OFFSET EXCLUSION ZONE 1m CONTOURS OHINEMURI RIVER OHINEMURI RIVER PIPE #1 DISCHARGE TO RIVER PIPE #2 DISCHARGE TO RIVER E OH 0 FOR CONSENT JS LS PR 25.03.22 CIVIL SITE LAYOUT OVERVIEW Figure 31 (From BECA 2022b)

RkJQdWJsaXNoZXIy MjE2NDg3