Supporting Technical Assessments

Boffa Miskell Ltd | Waihi North Project | Landscape and Visual Effects | 61 Contributing factors Implementation62 Operation63 Residual64 Level of Effect65 Nature of Effect66 Level of Effect Nature of Effect Level of Effect Nature of Effect N5: Black Hill • Views of changes to the Processing Plant and portals will remain with the footprint of the existing Processing Plant and unlikely to be discerned from the existing situation Low Neutral Low Neutral Low Neutral N1: Golden Valley Road • Views from transport corridors replacing existing infrastructure in the context of an existing Processing Plant in fleeting glimpsed views and represent a negligible change • NRS stockpiles and associated screen planting mitigates most of the Golden Valley Rd view Very Low Neutral Very Low Neutral Very Low Neutral 9.5 Processing and Water Treatment Plant Mitigation Containing all processing and water treatment activity within the existing footprint and structures ensures there is very limited potential landscape, natural character and visual effects associated with this aspect of the project. Where possible, all new and replacement infrastructure installed onsite should be coloured the same colour as the existing infrastructure and therefore remain visually recessive in this established and contained industrial context. 10.0 Tailings Storage Facility 3 As part of this project, the construction of an additional tailings storage facility is referred to as TSF3. This extends east of and adjoins the existing tailings storage facilities along the toe of a more elevated backdrop to the north and east. Once completed, TSF3 will accommodate an additional volume of approximately 5.7 million cubic metres, extending approximately 46 metres above existing ground level to an elevation of 155 masl. Construction of tailings storage facilities is a gradual sequential process rather than a development which occurs simultaneously and all at once. At completion the final surface will be established in pasture and appear integrated within the existing broader tailings storage facilities. 62 Effects during implementation before mitigation 63 Effects During Operation with Mitigation (5-10 years) 64 Residual Effects at Completion following mitigation 65 Level of Effect assessed as: Very High, High, Moderate-High, Moderate, Moderate-Low, Low, Very Low 66 Nature of Effect assessed as: Adverse, Neutral or Beneficial

RkJQdWJsaXNoZXIy MjE2NDg3