Supporting Technical Assessments

WKP-02 • Standpipe Piezometers • Shallow water levels already being monitored by WKP-02S and WKP-02D. • Deep groundwater proposed to be monitored by PAD02D_SP_PZ (310m) –Piezometer cell to be installed in the EG-Vein system. • PAD02S_SP_PZ (110m) to be installed in the interface of high resistivity zone –possible flow barrier. • Possibility to complete hydraulic tests in both new standpipe piezometers (slug / bail tests).

RkJQdWJsaXNoZXIy MjE2NDg3