Supporting Technical Assessments

Install Water Control Devices NOW THAT YOU HAVE STUDIED THIS REFERENCE MATERIAL IT IS TIME TO COMPLETE THE CHECKLIST AND TO DISCUSS YOUR ASSESSMENT WITH THE WORKPLACE TRAINER/ASSESSOR All drilling and grouting records are to be handed into the shift supervisor at the end of shift. All care should be taken to complete these documents as precisely as possible, as this data greatly affects future development and engineering requirements of the mine. 4. SELF ASSESSMENT CHECKLIST

RkJQdWJsaXNoZXIy MjE2NDg3