Supporting Technical Assessments

 In March 2012 a drill intersected ~ 80 l/s at high pressure (5200 kPa) and high temperature (49 degrees Celsius).  No previous mining in this area, but water was expected from previous exploration holes.  Required to mine an additional 600m. No knowledge of how far the water zone extended. The challenge began. Mineright

RkJQdWJsaXNoZXIy MjE2NDg3