Supporting Technical Assessments

REV DATE REVISION DETAILS APPROVED 0 07.06.22 Draft for review. Project WAIHI NORTH Title Erosion & Sediment Control Plan Willows Road Overview Drawn ZW Checked MP Drawing No. ESCP-WR-001-00 Sheet No. 0 NOTES 1. All erosion and sediment controls will be installed and maintained in accordance with the Waikato Regional Council Technical Report 2009/02 ‘Erosion and Sediment Control Guidelines for Soil Disturbing Activities’ (TR2009/02). 2. Completed areas to be stabilised in accordance with TR2009/02. 3. All erosion and sediment control measures will be inspected on a daily basis by the site foreman. 4. Site monitoring will be undertaken before and immediately after rain as well as during heavy rainfall events. Any required maintenance or improvements to control measures will be undertaken immediately. ESCP-WR-003-01 ESCP-WR-003-02 ESCP-WR-003-03 ESCP-WR-002-01 ESCP-WR-001-01 ESCP-WR-001-02

RkJQdWJsaXNoZXIy MjE2NDg3