| Project Description | Waihi North Project Air Discharge Assessment - Waihi Surface Facilities | 4396626-1331619777-99 | 16/06/2022 | 12 Both the proposed TF3 and GOP TSF will operate under the existing TSF operating procedures. Figure 2-3 TSF3 topsoil stripping and stockpile (image supplied by OGNZL) Figure 2-4 Conceptual plan of TSF3 at completion (image supplied by OGNZL).