Supporting Technical Assessments

WKP Visit December 2020 Table 4: Gauged flow summary by visit. Note gaugings for January 2019 completed by Golders. Distanced gauged from logger location given in brackets. Table 5a: GPS locations Location Latitude Longitude TStream West - upstream North branch S37.296873 E175.815307 T Stream West - upstream South branch S37.297960 E175.815392 T Stream West S37.297269 E175.815946 T Stream East S37.297171 E175.816956 Edmonds Stream S37.297752 E175.819334 Helipad S37.294414 E175.819149 “Hot spring” S37.294182 E175.823832 Trib R (unnamed) S37.293385 E175.824654 WKP3 S37.292848 E175.825207 Adams Stream S37.292198 E175.825238 WKP2 S37.290590 E175.829860 Thompson Stream S37.288942 E175.833283 Thompson ds trib S37.285935 E175.833825 Thompson S2 S37.298121 E175.830736 Thompson S3 S37.298122 E175.831170 WKP1 S37.266089 E175.834505 Trib S S37.285935 E175.834703 Trib T S37.285072 E175.836089 Trib U S37.284390 E175.836349 Trib V S37.283832 E175.838024 Trib W S37.282676 E175.838770 Trib X S37.281122 E175.838516 Trib Y S37.274591 E175.836231 WKP0 S37.260672 E175.835741 Lignite Stream (LS0) S37.260088 E175.835026 Location 30-31 Jan 2019 Flow (L/s) 20 June 2019 Flow (L/s) 17-18 Sept 2019 Flow (L/s) 28-30 Jan 2020 Flow (L/s) 20-21 May 2020 Flow (L/s) Aug 2020 (L/s) 14-15 Dec 2020 Flow (L/s) T Stream West 44.3 (2m ds) 60.8 (20m ds) 252.9 (5m ds) 28.8 (5m ds) 23.6 (5m ds) 144 (5m ds) 56.4 T Stream East 59.6 (10m ds) 53.0 (10m ds) 244.5 (15m ds) 33.3 (15m ds) 26.3 (15m ds) 142 (15m ds) 74.2 WKP3 79.6 (10m ds) 85.8 (25m ds) 424.5 (27m ds) 52.5 (27m ds) 36.9 (27m ds) 267 (27m ds) 95.3 (27m ds) WKP2 145.9 (40m ds) 90.5 (20m us) 426.2 (50m ds) 69.7 (20m us) 48.6 (20m us) - 120.9 (20m us) WKP1 - - 90.8 (330m ds) 68.2 (330m ds) - 164 (330m ds)

RkJQdWJsaXNoZXIy MjE2NDg3