GHD | Oceana Gold New Zealand Ltd. | 12552081 | Waihi North Project 55 prior to 2027, there will likely be less risk to the lower MUG stopes. If dewatering targets are not met, the impact will be on MUG mine development Figure 36 Dewatering pump rates, based on a maximum pump capacity of 15,500 m3/day (High K Scenario) Figure 37 Dewatering deficit from target, based on a maximum pump capacity of 15,500 m3/day (High K Scenario)