Table D3. Summary of Consequences for 1 in 100 AEP Flood-Induced Rainy Day Breach Scenario (Roads) Note: (1) Time of arrival and time to flood peak are relevant to the dam breach initiation. (2) The road is outside the flood extents. Road Flood length (km) Max. Flood Depth (m) Time of Arrival(1) (hr&min) Time to Flood Peak(1) (hr&min) Baxter Road 0.9 4.6 25 min 35 min Clarke Street 0.3 2.9 30 min 45 min Gilmour Street 0.1 0.9 40 min 50 min SH2 Tauranga Road 0.3 1.6 35 min 55 min Frankton Road 0.6 1.3 50 min 1 hr 20 min SH2 Normanby Road(2) - - - - Thorp Street and Willoughby Street(2) - - - -
RkJQdWJsaXNoZXIy MjE2NDg3