Supporting Technical Assessments

Table B1. Summary of Consequences for Sunny Day Breach Scenario (Bridges) Notes: (1) Time of arrival and time to flood peak are relevant to the dam breach initiation. (2) The bridge is overtopped by the flood and the detailed information is summarised in the corresponding road damage in Table B2. Bridge Distance Downstream (km) Time of Arrival(1) (hr&min) Time to Flood Peak(1) (hr&min) PAR(4) Potential Loss of Life(4) Baxter Road Bridge(2) 3.6 25 min 35 min - - Total 0 0

RkJQdWJsaXNoZXIy MjE2NDg3