Supporting Technical Assessments

Waihi North Project Preliminary Site Investigation (Ground Contamination) Williamson Water & Land Advisory Limited 8 the Coromandel Forest Park where the WUG and Dual Tunnel are proposed. The layout summary includes photographs where relevant to illustrate key features. An overview plan of the WNP areas is at Figure 2. Close up views of each of the above areas is illustrated on Figures 3 - 9. Heavy rainfall in the Waihi area preceded the site visit, with rain also occurring during the first half of the day of the inspection. Water flow in all areas was significant, with overflow drains, streams and the Ohinemuri River being under high flow. During the site inspections, no dwellings within the project footprint were able to be accessed. Descriptions relating to dwellings are from a distance.