Supporting Technical Assessments

EGL Ref: 8983 23 June 2022 Page 44 WAI-985-000-REP-LC-0004_Rev0.docx This report shall only be read in its entirety. protect life, property and the environment downstream. Storage 3 requirements will be incorporated in the existing OMS Manual. 12. An Emergency Action Plan is in place for the current TSFs, setting out procedures to manage and reduce the consequences associated with failure. This will be updated for Storage 3 (see Section 16.5). 19.0 PEER REVIEW Peer review of the detailed design is recommended by the NZDSG and will be required for building consent. The Peer Review Panel will also undertake independent review of the design. 20.0 CONCLUSIONS This technical report presents the proposed design, construction and operation of the proposed Storage 3 TSF. Storage 3 will be formed by a 46 m high downstream constructed earth and rockfill embankment dam with a proposed crest at RL155. Storage 3 can be developed into a TSF in a similar and safe manner as accomplished for Storage 1A and 2. The preliminary design analyses confirm that the expected performance meets criteria in the NZDSG.

RkJQdWJsaXNoZXIy MjE2NDg3