Supporting Technical Assessments

FINAL 700.35 JT, 28°/ 20°, u, sl, CLAY 703.39 JT, 59°/ 290°, u, r, CN 704.55 JT, 72°/ -, u, r, CN 705.20 JT, 73°/ -, u, r, CN 705.60 JT, 75°/ -, u, r, CN 705.95 JT, 45°/ -, u, sl, CLAY WAIPUPU FORMATION Slightly weathered; pale grey; clay altered ANDESITE; weak; pyrite disseminated; non magnetic (continued from layer starting at 681.2m ) Slightly weathered; light pale grey; ANDESITE; moderately strong; pyrite disseminated; non magnetic; some dark halos at defects End of Hole @ 706.8m, TD TCR: 100 RQD: 100 TCR: 100 RQD: 100 TCR: 100 RQD: 100 702 HQTT HQTT HQTT SW Sample / Test 700 701 702 703 704 705 706 707 708 709 710 20 60 200 600 2000 Estimated Strength (MPa) Defect Spacing (mm) Description (and sub Detail) Visual Defect Result Geological Unit Material Description Number / Type EW VW W MS S VS ES TCR RQD SCR (%) Depth (m) 701 702 703 704 705 706 707 708 709 RL (m) -35 -36 -37 Graphic Notes and Comments: Refer to explanation sheets for abbreviation and symbols. Ground Water Level Time Date Reading Hole depth (mbgl) (mbgl) Equipment: Rig 85 Orientation: 301° Inclination: -20° End of Hole @ 706.8m Contractor: Alton Drilling Casing Method Commenced: 17/05/2021 Easting: 2762594 Hole No. : WNDD011 Completed: 6/07/2021 Sheet : 71 of 71 Hole Length : 706.8 Project : WKP Exploration Tunnel - Ground Investigations Client : OceanaGold Corporation Job Number: 12533958 Processed : HJ System: NZMG 1949 Northing: 6424371 Checked : JHS Datum: NZVD2016 Logged : HJ Site : Willows Farm, Waihi North, Scale @ A4 : 1:50 Method: SURVEY RL: 205 m Flush Return (%) 25 50 75 Weathering Instrumentation Installation Water level Report ID: ROCKLOG || Project: WNDD011.GPJ || Library: GHD - NZGD.GLB || Date: 30 August 2021

RkJQdWJsaXNoZXIy MjE2NDg3