Supporting Technical Assessments

11101105 1100 1090 1070 1050 1030 1010 1080 1040 1090 1095 1090 1100 1105 1110 1115 1110 1100 1105 1105 1060 1020 OHINEMURI RIVER GLADSTONE PIT FOOTPRINT PROCESSING PLANT INFRASTRUCTURE CONVEYOR WETLANDS BAXTER ROAD OHINEMURI RIVER APPROXIMATE EXTENT OF EXISTING LANDSLIDE FEATURE (EGL, 2021) EXISTING TSF GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1 This Drawing must not be used for Construction unless signed as Approved GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Date Check Drafting Plot Date: Cad File No: Date Drawn Revision No A3 Rev: Drawing No: Original Size Title Project Client Check Designer Drawn Scale Design Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose. DO NOT SCALE Note: * indicates signatures on original issue of drawing or last revision of drawing 2 Salamanca Square Hobart TAS 7000 Australia GPO Box 667 Hobart TAS 7001 T 61 3 6210 0600 F 61 3 6210 0601 E [email protected] W www.ghd.com 17 June 2022 - 2:02 PM G:\51\12537997\CADD\Drawings\12537997-C002.dwg Plotted By: Wesley Herweynen (Project Director) Approved Job Manager Project Director PRELIMINARY OCEANA GOLD NEW ZEALAND LTD GLADSTONE PIT TSF PRE-FEASIBILITY STUDY SITE PLAN 12537997-C002 B V. JENKINS W. HERWEYNEN 1:5000 A ISSUED FOR CLIENT COMMENT VJ WH RL 16.04.21 B ISSUED FOR CONSENTING VJ WH RL 17.06.22 0 150m 50 100 SCALE 1:5000 AT ORIGINAL SIZE N

RkJQdWJsaXNoZXIy MjE2NDg3