Supporting Technical Assessments

FINAL 80.52 JT, 58°/ 80°, st, r, CA 80.80 JT, 59°/ 290°, u, r, CN 80.95 JT, 80°/ 210°, u, r, CN, trace CLAY 81.57 VN, 60°/ 78°, u, sm, Py, trace CA 81.65 VN, 32°/ 10°, u, sm, Py, trace CA, alteration halo 81.85 JT, 69°/ 240°, u, r, CA 81.90 JT, 57°/ 60°, u, r, CA 83.30 JT, 63°/ 85°, u, sm, CA 84.09 JT, 31°/ 230°, st, r, CA 84.62 JT, 50°/ 240°, u, r, CA 85.13 JT, 47°/ 300°, u, r, CA 85.60 JT, 71°/ 100°, u, sm, CA, trace CLAY 86.20 JT, 60°/ 100°, st, sm, CN, trace CLAY 86.27 JT, 25°/ 320°, u, r, CA 86.40 JT, 50°/ 340°, u, r, CA 86.58 JT, 50°/ 130°, u, r, CA 86.80 JT, 40°/ 325°, u, r, CA 86.94 JT, 62°/ 140°, u, r, CA, trace other sulphides 87.02 JT, 70°/ 80°, u, r, CA, trace CLAY and other sulphides 87.50 JT, 70°/ 70°, st, sm, CN 87.92 JT, 61°/ 5°, u, r, CN 88.17 VN, 20°/ 280°, u, sm, CA 88.37 VN, 18°/ 260°, u, r, CA, partial vein 88.45 JT, 50°/ 80°, u, sl, CA, trace CLAY 88.52 JT, 62°/ 230°, u, r, CN 89.17 JT, 40°/ 310°, u, r, CA 89.31 JT, 40°/ 310°, u, r, CA 89.46 JT, 38°/ 315°, u, r, CA 89.54 JT, 60°/ 290°, u, sl, CA 89.73 JT, 40°/ 295°, u, r, CA 89.82 JT, 30°/ 280°, u, r, CA WAIPUPU FORMATION Slightly weathered; grey; porphyritic ANDESITE; strong; pyrite disseminated; non magnetic; some randomly orientated calcite veins (2-6 mm) with pale grey alteration halos; some gravel to boulder sized inclusions of red (hematite altered) andesite (continued from layer starting at 67.5m ) TCR: 100 RQD: 100 TCR: 100 RQD: 91 TCR: 100 RQD: 100 TCR: 100 RQD: 100 TCR: 100 RQD: 90 TCR: 100 RQD: 89 TCR: 100 RQD: 80 PQTT PQTT PQTT PQTT PQTT PQTT PQTT SW Sample / Test 80 81 82 83 84 85 86 87 88 89 90 20 60 200 600 2000 Estimated Strength (MPa) Defect Spacing (mm) Description (and sub Detail) Visual Defect Result Geological Unit Material Description Number / Type EW VW W MS S VS ES TCR RQD SCR (%) Depth (m) 81 82 83 84 85 86 87 88 89 RL (m) 177 176 175 Graphic Notes and Comments: Refer to explanation sheets for abbreviation and symbols. Ground Water Level Time Date Reading Hole depth (mbgl) (mbgl) Equipment: Rig 85 Orientation: 301° Inclination: -20° End of Hole @ 706.8m Contractor: Alton Drilling Casing Method Commenced: 17/05/2021 Easting: 2762594 Hole No. : WNDD011 Completed: 6/07/2021 Sheet : 9 of 71 Hole Length : 706.8 Project : WKP Exploration Tunnel - Ground Investigations Client : OceanaGold Corporation Job Number: 12533958 Processed : HJ System: NZMG 1949 Northing: 6424371 Checked : JHS Datum: NZVD2016 Logged : HJ Site : Willows Farm, Waihi North, Scale @ A4 : 1:50 Method: SURVEY RL: 205 m Flush Return (%) 25 50 75 Weathering Instrumentation Installation Water level Report ID: ROCKLOG || Project: WNDD011.GPJ || Library: GHD - NZGD.GLB || Date: 30 August 2021

RkJQdWJsaXNoZXIy MjE2NDg3