Supporting Technical Assessments

June 2022 G-14642.71-006-R-Rev0_FINAL 38 Figure 22: Geological cross section through the Wharekirauponga deposit showing the relationship between the target EG vein and T-Stream vein. Tunnel access to the mine will be from the footwall side (right in this view) (source OGNZL). Figure 23: Conceptual underground mine design showing key elements of the mine (supplied by OGNZL).

RkJQdWJsaXNoZXIy MjE2NDg3