Supporting Technical Assessments

Mataura Stream CLIENT OCEANA GOLD (NEW ZEALAND) LIMITED LEGEND ( ( Scarp Ridgeline Alluvium Slope Instability Stream - Permanent Stream - Intermittent Lineaments Dual tunnels corridor Tunnel to plant corridor Willows access tunnel Design linework - SFA and WRS Roads Parcel boundary NOTES COPYRIGHT 1. Aerial: LINZ and Eagle Technology, CC-BY-3.0-NZ. 2. Map image: © OpenStreetMap (and) contributors, CC-BY-SA Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community 3. Schematic only, not to be interpreted as an engineering design or construction drawing. Information contained in this drawing is the copyright of Golder Associates (NZ) Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright. © Golder Associates (NZ) Ltd. PROJECT WAIHI NORTH PROJECT - GEOTECHNICAL ASSESSMENT TITLE GEOMORPHOLOGICAL LAYOUT 21464271 006 0 03 2022-03-04 ZJ SBC TM Path: K:\GIS\Projects-Dynamics\2021\21464271_OGL_Waihi\Map_documents\21464271-006-R-F003-Rev0_A3L_GIS.mxd IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: A3 CONSULTANT PROJECT NO. REPORT REV. FIGURE YYYY-MM-DD PREPARED REVIEW APPROVED 25mm 0 0 100 200 300 400 500 METRES REFERENCE SCALE: 1:8,000 (at A3) Map Extent Overview Map

RkJQdWJsaXNoZXIy MjE2NDg3