Supporting Technical Assessments

LEGEND Proposed design WRS Clean water diversion Stormwater draininage Design crest Design toe Culvert Under drain SECTION 3 Haul road Seepage collection underdrain Remove and stockpile topsoil material 0.3 m 265 m RL bench maximum elevation WRS Q17 WRS Q17 Haul road Original surface IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: A3 0 25 mm TITLE PROJECT NO. REV. PROJECT CONSULTANT PREPARED REVIEW APPROVED YYYY-MM-DD WAIHI NORTH PROJECT - GEOTECHNICAL ASSESSMENT WATER MANAGEMENT - UPPER WRS INDICATIVE SECTION 3 (Q17) 20148384 REPORT 017 FIGURE E03 CLIENT OCEANA GOLD (NEW ZEALAND) LIMITED 2021-11-22 ZJ SBC TM \\azaeccfsvm1\Auckland\GIS\Projects-Dynamics\2020\20148384_OGL_Waihi\MapDocuments Information contained in this drawing is the copyright of Golder Associates (NZ) Ltd. Unauthorised use or reproduction of this plan either wholly or in part without written permission infringes copyright. © Golder Associates (NZ) Ltd. COPYRIGHT 1. Schematic only, not to be interpreted as an engineering design or construction drawing. 2. Figure must be printed in colour. NOTES

RkJQdWJsaXNoZXIy MjE2NDg3