June 2022 G-01483.84-017-R-Rev0 Because the 28 Table 12: Schedule summary of cumulative material movement volumes (loose cubic metres (LCM) by year (rounded) to WRS. Year 1 2 3 4 Year 5 Q17 Total WUG tunnel development rock to WRS, cumulative [LCM] 60,000 267,000 480,000 749,000 817,000 WUG Portal Access Road development cut material [LCM] 30,000 30,000 30,000 30,000 30,000 Collection pond development cut material [LCM] 30,000 30,000 30,000 30,000 30,000 Total Estimated Rock* to WRS, cumulative [LCM] 120,000 327,000 540,000 809,000 876,000 *rounded to nearest 1000. Topsoil and weak surficial materials removed from the various element footprints will be salvaged and stockpiled/placed in bunds for use in the future site rehabilitation. Topsoil in the WRS footprint will be progressively removed as layers are built up. Table 13 summarizes the estimated volumes for the main elements by quarter and year. Table 13: Estimated WRS and surface elements soil material volumes in cubic metres (rounded*). Year 1 2 3 4 Year 5 Q17 Total Topsoil WRS total footprint (0.3m depth) plus 10% to allow for drainage channels to stockpile [m3] 5,000 5,000 3,000 3,000 16,000 WRS weak soils (0.35 ha of toe area @1.0 m depth) excavation [m3] 4,000 4,000 Topsoil WUG Portal Access Road to stockpile (m3) 2,000 2,000 Topsoil Willows Collection Pond footprint (m3) to stockpile 3,000 3,000 Total Cumulative (BCM) 14,000 5,000 3,000 3,000 25,000 *rounded to nearest 1000.

RkJQdWJsaXNoZXIy MjE2NDg3