Proposed Resource Consent Conditions

14 Area Objective Treatment Timeframe Ensure that the hydrological (surface and groundwater) connection and hydrological replenishment is maintained. Enrichment planting as detailed in the Riparian Planting Plan. Other Riparian Planting within OGNZL owned land To protect and enhance aquatic ecological values To enhance stream conditions and connectivity throughout stream and river network of the Ohinemuri River catchment Stock exclusion. Low stature riparian planting to prevent bank erosion and provide bank stability High stature riparian planting to provide approximately 70% shade to stream channel. Weed and pest browse control until riparian area matures (up to five-years). Pioneer planting complete as soon as practicable but no more than 10 years following commencement of activities within Area 2. Enrichment planting as detailed in Riparian Planting Plan. Other Riparian Planting on land owned by others To protect and enhance aquatic ecological values To enhance stream condition and connectivity throughout stream and river network of the Ohinemuri River catchment Stock exclusion. Low stature riparian planting to prevent bank erosion and provide bank stability High stature riparian planting to provide approximately 70% shade to stream channel. Weed and pest browse control until riparian area matures (up to five-years). Pioneer planting complete as soon as practicable but no more than 10 years following commencement of activities within Area 2. Enrichment planting as detailed in Riparian Planting Plan. Figure B – Offset Planting Riparian Planting of Diversion To offset for stream diversions To recreate and enhance instream habitat and ecological function of diverted watercourse. To protect and enhance aquatic ecological values. Stock exclusion. Low stature riparian planting to prevent bank erosion and provide bank stability High stature riparian planting to provide approximately 70% shade to stream channel. Weed and pest browse control until riparian area matures (up to five-years). As soon as practicable but within one year of the completion of construction works on the diversion.

RkJQdWJsaXNoZXIy MjE2NDg3