Proposed Resource Consent Conditions

27 Condition Explanation Diesel 80,000 L Services bay 6,000 L Underground 550 L Generator tank 150 L Fire pump Ammonium nitrate emulsion (ANE) 40,800 kg Oxidiser storage area Gasser 8,000 L Oxidiser storage area Lime 70,000 kg Lime silo Oxygen gas 60 m3 Workshop located in the SFA Acetylene gas 20 m3 Workshop located in the SFA Oils, greases 8,000 L Workshop stores c. Area 5: Substance Maximum Volume Storage Location High calcium hydrated lime 306,000 L Three tanks (102,000 L each) at the north of the WTP High calcium quicklime 70,000 kg Silo west of the Processing Plant Caustic soda (Sodium hydroxide) 24,000 L Tanks on the western side of the electrowinning area. Hydrochloric Acid (>25%) 24,000 L Tanks on the western side of the electrowinning area. Oxygen gas 30,000 L Cryogenic pressure vessel, east of the Processing Plant. Carbon Dioxide 40,000 kg/L Two cryogenic pressure vessels in the WTP Diesel 200,000 L Various units: Self-bunded isotainers (20,000 L) or portable tanks (<6,000 L) Workshop Maintenance oils and greases* 8,000 L Various units (tank, IBC or 205 L drum) located at the workshop Transformer oil 8,640 L Bunded transformer units: two 3,500 L transformers and one 1,740 L transformer.

RkJQdWJsaXNoZXIy MjE2NDg3