3 Condition Explanation xv. Establishment and use of offices, amenity facilities and workshops; laydown yards, emergency response facilities and other mine services; xvi. Establishment and use of carparks; xvii. Erection of internal signs to provide directions, safety instructions and information for staff and visitors within the site; xviii. The storage and use of hazardous substances; xix The installation and use of monitoring equipment, including piezometers; xx The disturbance of soil and change of the land use at a HAIL site; and xxi. Rehabilitation and closure activities. d. Within Area 3: i. The construction, operation and maintenance of the Wharekirauponga Access Tunnel and establishment of the new portal for the Tunnel; ii. The establishment and use of monitoring equipment, including piezometers; and iii. The storage and use of hazardous substances. e. Within Area 4: i. The establishment, use and maintenance of the services trench. ii The disturbance of soil at a HAIL site. f. Within Area 5: i. Exploration, geotechnical and dewatering drilling and the installation of piezometers associated with the establishment and operation of Gladstone Open Pit; ii. The clearance of vegetation, topsoil and stockpiling, and the implementation of sediment control measures; iii. The establishment and use of a topsoil stockpile adjacent to Gladstone Open Pit; iv. The establishment of noise bunds / screens and security fencing; v. The establishment and use of water management infrastructure, including new diversion and dewatering drains and storage ponds; vi. The formation and use of internal access roads; vii. The establishment and operation of crushers to crush rock and conveyors to transport rock; viii. The disestablishment of the existing Favona portal and related infrastructure; ix. The establishment and use of a new Martha Underground portal to the Trio upper access drive to access existing underground mines and Martha Pit;

RkJQdWJsaXNoZXIy MjE2NDg3