Proposed Resource Consent Conditions

176 CONSENT TYPE AND ACTIVITIES AUTHORISED S13 To erect overflow spillways from Collection Ponds S6 and S7 in, on and over the bed of the Ruahorehore Stream. S15 To discharge water to surface water from Collection Ponds (S6 and S7) via an emergency spillway. LOCATION Area 7 TERM 35 years LAPSE PERIOD 10 years Schedule One – Common Conditions Which Apply to All Waikato Regional Council and Hauraki District Council Consents 1 The Consent Holder shall comply with the common conditions between the Hauraki District Council and the Waikato Regional Council in Schedule One as relevant to the management of activities authorised by this consent. Schedule Two – General Conditions Which Apply to All Waikato Regional Council Consents 2 The Consent Holder shall comply with the general conditions in Schedule Two which apply to all Waikato Regional Council consents as relevant to the activities authorised by this consent General Requirements 3 At least 20 working days prior to the first exercise of this consent, the Consent Holder shall advise the Waikato Regional Council in writing of the date upon which the exercise of this consent is to be physically commenced. Design and Construction 4 The Consent Holder shall be responsible for the structural integrity and maintenance of the works associated with the exercise of this consent and for any erosion control and energy dissipation works which become necessary as a consequence of the exercise of this consent. 5 Collection Ponds (S6 and S7) shall be designed, and constructed and operated to have a minimum water storage capacity equivalent to the volume of run-off generated from within its catchment during a 10-year return period, 24-hour duration, design storm. 6 Subject to Condition 7, for 24-hour rainfall events with a return period less than or equal to ten years, all stormwater reporting to Collection Ponds (S6 and S7) shall be pumped to the Water Treatment Plant for treatment.

RkJQdWJsaXNoZXIy MjE2NDg3