Proposed Resource Consent Conditions

165 CONSENT TYPE AND ACTIVITIES AUTHORISED S14 To dam water in TSF3. S14 To divert runoff from within the TSF3 footprint to Collection Pond S7. S14 To divert intercepted groundwater and subsurface drainage from TSF3 activities to treatment. S15 To discharge overburden to land to construct, operate and rehabilitate TSF3 and the associated haul road and Collection Ponds. S15 To discharge tailings into TSF3. S15 To discharge seepage from TSF3 into the ground. LOCATION Area 7 TERM 35 years LAPSE PERIOD 10 years Schedule One – Common Conditions Which Apply to All Waikato Regional Council and Hauraki District Council Consents 1 The Consent Holder shall comply with the common conditions between the Hauraki District Council and the Waikato Regional Council in Schedule One as relevant to the management of activities authorised by this consent. Schedule Two – General Conditions Which Apply to All Waikato Regional Council Consents 2 The Consent Holder shall comply with the general conditions in Schedule Two which apply to all Waikato Regional Council consents as relevant to the activities authorised by this consent Note: Schedule Two contains a comprehensive suite of conditions which address: - Erosion and sediment control; - Fish salvage and relocation; and - Requirements for mitigating and offsetting residual effects on aquatic ecology, including minimum design requirements for new channel construction and riparian planting. General Requirements

RkJQdWJsaXNoZXIy MjE2NDg3