Proposed Resource Consent Conditions

163 4 The Southern Uphill Diversion Drain shall be constructed in general accordance with the design outlined in the document titled “Oceana Gold (New Zealand) Limited –Waihi Operation, New Zealand–Tailings Storage and Rock Disposal Volume 3 –Proposed Tailings Storage Facility Storage 3 RL155 –Technical Report’ as included in Part H of the application documents. 5 Diversion channels and associated works shall be designed to convey the run-off resulting from a 10-year return period design storm. 6 All construction works shall be implemented under the supervision of persons with appropriate experience in the supervision of civil engineering construction works. 7 The Consent Holder shall advise Waikato Regional Council in writing in advance of the proposed construction of each of the diversion channels, and shall provide plans of the proposed works, and advise as to proposed start times for construction. 8 Within 20 working days following completion of each diversion, the Consent Holder shall provide Waikato Regional Council with as-built plans of the completed works.

RkJQdWJsaXNoZXIy MjE2NDg3