Proposed Resource Consent Conditions

142 CONSENT TYPE AND ACTIVITIES AUTHORISED S13 To reclaim the bed of TB1 Stream and unnamed tributaries of TB1 Stream in association with the establishment of the Northern Rock Stack, and adjacent haul roads, perimeter roads and perimeter drains. S15 To discharge contaminants to land associated with the storage and use of overburden (including potentially acid forming material). S15 To discharge contaminants from seepage water from the Northern Rock Stack to ground S14 To divert intercepted groundwater and underdrain seepage water to the Water Treatment Plant using a subsurface drainage system, leachate drainage system and perimeter ring system of sumps and pipes. S14 To divert runoff from within the Northern Rock Stack footprint to the Northern Rock Stack Collection Pond, and from there, to the Water Treatment Plant. LOCATION Area 6 TERM 35 years LAPSE PERIOD 10 years Schedule One – Common Conditions Which Apply to All Waikato Regional Council and Hauraki District Council Consents 1 The Consent Holder shall comply with the common conditions between the Hauraki District Council and the Waikato Regional Council in Schedule One as relevant to the management of activities authorised by this consent. Schedule Two – General Conditions Which Apply to All Waikato Regional Council Consents 2 The Consent Holder shall comply with the general conditions in Schedule Two which apply to all Waikato Regional Council consents as relevant to the activities authorised by this consent General Requirements 3 At least 20 working days prior to the first exercise of this consent, the Consent Holder shall advise the Waikato Regional Council in writing of the date upon which the exercise of this consent is to be physically commenced. Design Requirements 4 The Northern Rock Stack shall not materially exceed the footprint shown in the figure annexed as Attachment 1 to this consent.

RkJQdWJsaXNoZXIy MjE2NDg3