Proposed Resource Consent Conditions

67 CONSENT TYPE AND ACTIVITIES AUTHORISED S13 To place and use culverts within the Willows Road Surface Facility Area. LOCATION Area 2 TERM 35 years LAPSE PERIOD 10 years Schedule One – Common Conditions Which Apply to All Waikato Regional Council and Hauraki District Council Consents 1 The Consent Holder shall comply with the common conditions between the Hauraki District Council and the Waikato Regional Council in Schedule One as relevant to the management of activities authorised by this consent. Schedule Two – General Conditions Which Apply to All Waikato Regional Council Consents 2 The Consent Holder shall comply with the general conditions in Schedule Two which apply to all Waikato Regional Council consents as relevant to the activities authorised by this consent Note: Schedule Two contains a comprehensive suite of conditions which address: - Erosion and sediment control; - Fish salvage and relocation; and - Requirements for mitigating and offsetting residual effects on aquatic ecology, including minimum design requirements for new channel construction and riparian planting. General Requirements 3 At least 20 working days prior to the first exercise of this consent, the Consent Holder shall advise the Waikato Regional Council in writing of the date upon which the exercise of this consent is to be physically commenced. Culvert Design 4 All culverts shall be designed to convey the runoff resulting from at least a 20-year return period, 24-hour duration, design storm. 5 Fish passage must be provided on diversions and culverts for temporary works of greater than two (2) days in duration during the migration period for target fish species.

RkJQdWJsaXNoZXIy MjE2NDg3