Proposed Resource Consent Conditions

63 c. A contingency plan to be actioned in the event a trigger level is exceeded over two consecutive readings, and which is sufficient to assess the source of the change, and to determine what, if any, mitigation measures should be implemented to ensure that General Condition G33 is complied with. In detailing the monitoring programmes the Consent Holder shall provide information on the monitoring methods proposed, the monitoring locations, parameters to be monitored, and the calibration and maintenance of monitoring equipment. 23 Construction of the Willows Rock Stack must not commence until the Willows Rock Stack Monitoring and Management Plan required by Conditions 20 – 22 has been certified by the Waikato Regional Council. 24 The Consent Holder shall review and update (as necessary) the Willows Rock Stack Monitoring and Management Plan and shall provide any such updated Plan to the Waikato Regional Council for certification in accordance with Condition 20. 25 The Consent Holder must implement the certified Willows Rock Stack Monitoring and Management Plan. However, in the event of any inconsistency between the conditions of this consent and the Willows Rock Stack Monitoring and Management Plan the conditions of this consent shall prevail. Willows Rock Stack Monitoring Report 26 The Consent Holder shall provide to the Waikato Regional Council an annual Willows Rock Stack Monitoring report. The report shall include at least the following information: a. The data from monitoring undertaken during the previous year. b. Identification of any environmentally important trends associated with the above monitoring. c. Interpretation and analysis of any change in ground water chemistry over the previous year and predictions of any future changes in groundwater or surface identify what contingency actions, if any, it proposes to take in response to these predictions. d. Any contingency actions that may have been taken during the year. e. Comment on compliance with all conditions and any reasons for non-compliance or difficulty in achieving conformance with the conditions of this consent. f. A summary and analysis of any complaints relevant to this consent, from the complaint log (refer Schedule One). g. Any works that have been undertaken to improve environmental performance or that are proposed to be undertaken in the

RkJQdWJsaXNoZXIy MjE2NDg3