B-7 – Area 7 - Assessment of Environmental Effects 39 Figure 25: Vegetation Clearance in SNA T13UP166 (Source: Bioresearches’ Assessment of Environmental Effects). 3.2.5 Drains and Collection Ponds New water management infrastructure associated with TSF3 will include: Southern Uphill Diversion Channel Extension; Subsurface Drains; and, TSF3 Perimeter Drain and Collection Ponds. Each is shown in Figure 26 and described below.
RkJQdWJsaXNoZXIy MjE2NDg3