B-7 – Area 7 - Assessment of Environmental Effects 36 3.2 PREPARATORY WORKS Figure 24 provides an overview of the preparatory works required for TSF3. These include: Establishment of erosion and sediment controls; Clearing the site of fences and farm services; Relocating electricity supply ready for reestablishment; Establishing a haul road down the East Stockpile to the TSF3 site; Sheeting of access roads; Progressive mulching and burning (if required) of vegetation; Progressive vegetation stripping and topsoil stripping and stockpiling; Cutting of additional farm drains as required to drain the surficial soils; Construction of the extended Southern Uphill Diversion Drain behind TSF3 site; and, The realignment of the Ruahorehore Stream. Figure 24: TSF3 Preparatory Works (EGL (2022c)).