Site-specific Assessments of Environmental Effects

B-7 – Area 7 - Assessment of Environmental Effects 13 The diversion of natural water around the existing disturbed area, including via the Southern Diversion Drain which will be extended as part of the Waihi North Project; The discharge of water from ponds S4 and S5 to surface water during high flow events; The discharge of material to land within the eastern stockpile; and Various consents which authorise the establishment and operation of TSF1A. Table 1: Existing WRC resource consents for activities at Area 7. Resource Consent Expiry Date Discharge to Air AUTH 124859.01.04 [Project Martha consent] Discharge contaminants into the air relating to all activities within the Golden Link Project Area. This includes dust and carbon dioxide arising from mining operations, emissions from the Process Plant including waste heat and water vapour, vehicle fumes, and other minor and/or fugitive emissions associated with mining operations; and within Area D only, smoke from burning of tramp material (including vegetation and surplus packaging) 16 July 2037 Diversion Drains AUTH 971307 To divert natural water (farm run-off and intercepted groundwater) around the eastern side of Storage 1A via the southern diversion drain 13/10/2034 AUTH 971308 To discharge natural water (farm run-off and intercepted groundwater) diverted around the eastern side of Storage 1A into the southern diversion drain and thence to an unnamed tributary (Unnamed Stream 3) of the Ruahorehore Stream 13/10/2034 AUTH 971300 To divert natural water (farm run-off and intercepted groundwater) around the surplus soil stockpiles via the southern diversion drain 13/10/2034 AUTH 971301 To discharge natural water (farm run-off and intercepted groundwater) diverted around the surplus soil stockpiles via the southern diversion drain into an unnamed tributary 13/10/2034

RkJQdWJsaXNoZXIy MjE2NDg3