B-6 – Area 6 – Assessment of Environmental Effects 75 Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL equipment refuelling and from a spill of packaged goods during unloading to site. Zealand Standards and Codes of Practice and the Hazardous Substances and New Organisms Act 1996 and Regulations. Terrestrial Ecology Impacts to bats during vegetation clearance. A Bat Management Plan will be prepared and implemented during vegetation removal by a suitably experienced and qualified ecologist which includes pre-clearance surveys and vegetation removal protocols. As required in the Bat Management Plan. None. Impacts to birds during vegetation clearance. An Avifauna Management Plan will be prepared and implemented which includes vegetation removal protocols during peak bird breeding season. As required in the Avifauna Management Plan. None. Impacts to lizards during vegetation clearance. Preparation and implementation of a Lizard Management Plan prior to vegetation removal that details capture, habitat enhancement and relocation of potentially present native lizards. Post release monitoring of the Lizard Habitat Enhancement Area in accordance with the Lizard Management Plan. None. Accidental vegetation loss. Measures to avoid or minimise vegetation and habitat loss through onsite management. This would include avoidance of unnecessary vegetation clearance through the physical delineation of the footprint boundary. None. None. Loss of 8.1 ha of planted native vegetation and 1 ha of pine. Replacement planting for the planted native vegetation and pine that would be removed. Monitoring as part of maintenance requirements None.
RkJQdWJsaXNoZXIy MjE2NDg3