Site-specific Assessments of Environmental Effects

B-6 – Area 6 – Assessment of Environmental Effects 69 Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL The NRS Collection Pond will be converted to wetlands and will be rehabilitated. Restoration, riparian and wetland edge planting, and provision of recreational trails will be undertaken at closure to mitigate any long term effects. Lighting Lighting impacts on neighbours. Night lighting installed will be located and shaded so that the level of light measured at the boundary of any site not owned by OGNZL is no greater than 8.0 lux, unless there is an agreement with that landowner. Where luminaires are visible from external locations or are high output floodlights, they will be: Installed such that their light producing faces are horizontal to the ground; Luminaires aimed away from external locations; ie. into the site; or Of luminous intensity not exceeding the limits set out in AS/NZS 4282 for the applicable environmental zone. None. None. Recreation The NRS will affect a small section of the full and Half OGNZL will engage with organisers about new development opportunities. None. None.

RkJQdWJsaXNoZXIy MjE2NDg3