Site-specific Assessments of Environmental Effects

B-6 – Area 6 – Assessment of Environmental Effects 68 Table 6: Summary of key management and monitoring measures for Area 6 (Northern Rock Stack) Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL Cultural Matters Potential effects on matters of importance to the iwi of Waihi, and their relationship with ancestral lands and water. To be confirmed through CVA / CIA process described in Section 5 of the Overarching AEE. To be confirmed through CVA / CIA process described in Section 5 of the Overarching AEE. To be confirmed through CVA / CIA process described in Section 5 of the Overarching AEE. Landscape, Natural Character and Visual Amenity Gradual modification of a localised rural area within the Martha Mineral Zone. Screen planting along the periphery and margins of Golden Valley Road. Temporary topsoil stockpiles will be developed along the margins of Golden Valley Road which will be seeded in grass and enclose the area where the NRS is formed. Reinstatement of riparian and terrestrial vegetation along the margins of diverted streams and reinforcing existing vegetation along the Ohinemuri River. At completion, much of the rock will be reused and the resultant landform will be recontoured and grassed to support adjoining rural landuse through rehabilitation. The Northern Uphill Diversion Drains is to be retained permanently as it will provide the outlet channel for TSF2 in closure. None. None.

RkJQdWJsaXNoZXIy MjE2NDg3