B-6 – Area 6 – Assessment of Environmental Effects 8 Various Waikato Regional Council (“WRC”) resource consents authorise activities at TSF2 and the Northern Stockpile area. They are listed in Table 1 below and authorise: The discharge of contaminants to air within the footprint of the existing works; The diversion of natural water around the existing disturbed area, including via the Northern Diversion Drain which will be extended as part of the Waihi North Project; The discharge of water from collection and silt ponds to surface water during high flow events; The discharge of material to land within the Northern Stockpile; Various consents which authorise the establishment and operation of TSF2; and The discharge of water from TSF2 to TB1 following rehabilitation.
RkJQdWJsaXNoZXIy MjE2NDg3