Site-specific Assessments of Environmental Effects

B-5 – Area 5 - Assessment of Environmental Effects 20 1991. Some 91,600 plants, covering around 18.8 ha of riverbank, were planted along the Ohinemuri River mainstem near the Martha Mine site between 1995 and 2005. Given the time that has passed since, the resultant mature riparian vegetation contributes greatly to the ecological values of the Ohinemuri River. Extensive replanting along tributaries of the Ohinemuri River, including the Ruahorehore Stream east of Baxter Road, has also been undertaken by OGNZL and its predecessors, encompassing some 10 ha with around 107,000 plants (Boffa Miskell 2022a). The timing and extent of revegetation works around the Waihi SFA is shown in Figure 10, below.

RkJQdWJsaXNoZXIy MjE2NDg3