Site-specific Assessments of Environmental Effects

B-5 – Area 5 - Assessment of Environmental Effects 12 Resource Consent Expiry Date AUTH 971315 To discharge water from the collection pond to the Ohinemuri River. 13/10/2034 AUTH 971311 To discharge settled stormwater from the silt ponds into the Ohinemuri River and the Ruahorehore Stream. 13/10/2034 AUTH 971312 To discharge water from the collection ponds within Area D, to the Ohinemuri River and to the Ruahorehore Stream. 13/10/2034 Stockpiles AUTH 971295 To place ore, waste rock, topsoil and other material in stockpiles. 13/10/2034 AUTH 109744 To discharge waste rock and ore onto land in temporary surface stockpiles and to discharge seepage from the temporary stockpiles into ground [Polishing Pond Stockpile]. 31/12/2028 2.5 ZONING As shown in Figure 5, the Hauraki District Plan (“HDP”) identifies Area 5 as being located within the Rural Zone and the Martha Mineral Zone. The site is bounded by land in the Martha Mineral Zone to the east, the Reserve (Passive) Zone to the south (Ngātikoi Domain), and the Rural Zone to the west and north. The nearest land within the Residential Zone is approximately 150 m north of the site.

RkJQdWJsaXNoZXIy MjE2NDg3