Site-specific Assessments of Environmental Effects

B-5 – Area 5 - Assessment of Environmental Effects Figure 37: Moresby Avenue and Baxter Road Facilities – Workforce Forecasts (including Project Martha), Stantec (2022). 104 LIST OF TABLES Table 1: How the use of land for each existing element within Area 5 is authorised. 7 Table 2: Existing WRC resource consents for activities at Area 5. 10 Table 3: Summary statistics for water quality at selected sites in Ohinemuri River (data shows median values, with all units g/m³ unless stated). 29 Table 4: Hazardous substance volumes and classifications 64 Table 5: Activity status of land use consents required for the works associated with the GOP, GOP TSF, and Waihi SFA (Area 5). 72 Table 6: Activity status of the resource consents required to establish and operate the GOP and GOP TSF (Area 5). 79 Table 7: Activity status of the resource consents required to establish and operate the Waihi SFA (Area 5). 85 Table 8: Overview of the level of effects resulting from the proposed GOP (including effects management). 115 Table 10: Summary of the management and monitoring measures for Area 5. 124 Table 11: Consideration of Alternative Methods of Discharge. 187

RkJQdWJsaXNoZXIy MjE2NDg3