B-2 – Area 4 - Assessment of Environmental Effects 27 5.6 CONCLUSION The nature of the proposed activities in Area 4 means their effects are predominantly confined to construction, as once established, the only notable presence of the activity will be the pipe bridges across the Ohinemuri River adjacent to existing road bridges. Those construction related effects will be temporary and able to be effectively managed in using conventional means to achieve an acceptable outcome. These measures are discussed in Section 6 of this AEE and are detailed in the proposed consent conditions contained in Part E of these application documents.
RkJQdWJsaXNoZXIy MjE2NDg3