B-2 – Area 2 - Assessment of Environmental Effects 87 Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL Terrestrial Ecology Clearance of vegetation None. None. Significant additional terrestrial planting on the border of the site with the CFP. Impacts to bats during vegetation clearance. A Bat Management Plan will be prepared and implemented during vegetation removal by a suitably experienced and qualified ecologist which includes pre-clearance surveys and vegetation removal protocols. As required in the Bat Management Plan. None. Impacts to birds during vegetation clearance. An Avifauna Management Plan will be prepared and implemented which includes vegetation removal protocols during peak native bird breeding season. As required in the Avifauna Management Plan. None. Impacts to lizards during vegetation clearance. Preparation and implementation of a Lizard Management Plan prior to vegetation removal that details capture, habitat enhancement and relocation of potentially present native lizards. Post release monitoring of the Lizard Habitat Enhancement Area in accordance with the Lizard Management Plan. None. Accidental vegetation loss. Measures to avoid or minimise vegetation and habitat loss through on-site management. This would include avoidance of unnecessary vegetation clearance through the physical delineation of the footprint boundary. None. None. Contaminated Land
RkJQdWJsaXNoZXIy MjE2NDg3