Site-specific Assessments of Environmental Effects

B-2 – Area 2 - Assessment of Environmental Effects 75 Table 6: Summary of key management and monitoring measures for Area 2. Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL Cultural matters Potential effects on matters of importance to the iwi of Waihi, and their relationship with ancestral lands and water. To be confirmed through CVA / CIA process described in Chapter 5 of the Overarching AEE. To be confirmed through CVA / CIA process described in Chapter 5 of the Overarching AEE. To be confirmed through CVA / CIA process described in Chapter 5 of the Overarching AEE. Landscape, Natural Character and Visual Amenity Alteration of existing landform at the Willows SFA and temporary landscape character and visual effects. Implement additional screen planting to screen the Willows SFA from neighbouring properties. Retain existing shelterbelts, trees and hedges at the Willows SFA outside disturbed areas where practicable. Vegetate or seed noise bunds as soon as practicable after construction. Finish exposed batters on all access road with rounded edges to integrate within the adjoining landform and then scarify the exposed soil on these batters and seed with pasture and/or native vegetation to assimilate within the surrounding land cover. Seed proposed earth mounding associated with the explosive magazine as soon as practicable after construction to reduce visibility of buildings. Finish buildings and structures in neutral, recessive colours which relate to their rural setting. None. None.

RkJQdWJsaXNoZXIy MjE2NDg3