Site-specific Assessments of Environmental Effects

B-2 – Area 2 - Assessment of Environmental Effects 17 Figure 9: Willows Road Farm groundwater monitoring locations and interpreted piezometric contours (GHD 2022b). Figure 10: Willows Road Farm west-east conceptual cross-section (GHD 2022b). 2.13 HYDROLOGY The hydrology of the site is described in GHD (2022) a copy of which is provided in Part H of these application documents. The site is contained within the Mataura Stream catchment (see Figure 11)

RkJQdWJsaXNoZXIy MjE2NDg3