Site-specific Assessments of Environmental Effects

B-1 - Area 1, Coromandel Forest Park – Assessment of Environmental Effects 92 Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL Ongoing monitoring during mine development; and Assembling and adhering to suitable Trigger Action Response Plans during the mine development in response to that monitoring so that methods of mitigation to control groundwater ingress occurrences are suitably adapted to address any deviations from expected conditions so that the requirements of Condition 4 are achieved. Ground Settlement No measures which are additional to those required to manage dewatering and effects on surface water. None. Discharge of contaminated groundwater into the environment. Groundwater which impacts on workings will be collected and either used underground for drilling or pipe to the WTP for treatment. None. None.