B-1 - Area 1, Coromandel Forest Park – Assessment of Environmental Effects 91 Actual or Potential Effect Recommended Mitigation / Management Recommended Monitoring / Future Action Additional Measures Proposed by OGNZL grouting and other mitigation employed to manage groundwater ingress. advance of mining occurring in locations; Assembling and adhering to suitable Trigger Action Response Plans during the tunnelling in response to that monitoring so that methods of mitigation to control groundwater ingress occurrences are suitably adapted to address any deviations from expected conditions so that the requirements of Condition 4 are achieved. Effects on surface water due to the WUG Implement the development methodology identified as appropriate for this purpose in Valenza (2022) (see Part H of these application documents and Section 6.3 above). Periodic reporting to WRC and the Expert Panel on tunnel progress, key monitoring data and the effectiveness of the grouting and other mitigation employed to manage groundwater ingress. See Section 6.3 above. The conditions require: Baseline monitoring; Installation of monitoring instruments and hydraulic testing in zones of potential impact in advance of mining occurring in locations; None.
RkJQdWJsaXNoZXIy MjE2NDg3